Specification desk: IES/LDT and application supportAccess files
Solar street luminaires illuminating an urban boulevard

Outdoor photometry, documented

Fonroche lighting engineered around the site

Evaluate solar street, area and sports lighting through mounting geometry, candela distribution, illuminance targets and maintainable system architecture.

Documentation scope

Certification evidence placed in project context

UL

North American product evaluation

Applicable product families are accompanied by the safety documentation needed for the intended market and installation scope.

CE

European conformity records

Declarations are organized by luminaire family so specifiers can connect the marked product to relevant directives.

RoHS

Restricted-substance declarations

Material compliance records support procurement reviews without presenting environmental claims as performance certification.

Optical comparison

Compare distributions before comparing wattage

Two representative configurations illustrate the parameters that shape an outdoor scheme. Final values depend on selected family and project geometry.

ParameterRoadway opticArea optic
Distribution intentLongitudinal road coverageBroad parking and plaza coverage
CCT options3000 K / 4000 K3000 K / 4000 K / 5000 K
Ingress protectionIP65 family dependentIP66 family dependent
Surge strategyProject voltage coordinatedExposure class coordinated
Photometric formatIES / LDTIES / LDT

Engineering continuity

Three decades of outdoor project learning

Outdoor lighting focus established

Project work began with field constraints, dependable construction and clear installation practice.

Photometric workflow formalized

Optical files and calculation inputs became a structured part of product-family documentation.

Solar system coordination expanded

Energy autonomy, seasonal resource and luminaire load were treated as one site-specific design problem.

Specification resources connected

File access, distribution guidance and application review now support teams from concept through handover.

Put the calculation before the quotation

Share pole spacing, mounting height, target levels and operating profile for a focused application review.

Submit Project Criteria